Edgewood Road Improvements & Flood Risk Management Project

Edgewood Road Improvements & Flood Risk Management Project

Edgewood Road Improvements & Flood Risk Management Project City of Fargo - Project #FM-15-L0 Public Informational Meeting December 6, 2016 Overview / Why Are We Here? Golf Course Ave Improvements

Flood Risk Project Summary

Path Forward / Project Schedule Acquisitions Overview Questions

Golf Course Ave Improvements Per the agreement made between the Fargo Park District, the Developer, and the City of Fargo, Golf Course Ave will be dedicated as a public street and improved to City Standards FEMA Floodplain Impacts

FEMA Effective 100yr SoWhy do Flood Control now? Short Term: It is more cost effective to incorporate flood control now into the road improvements project Reduce emergency measures-immediate benefit from project Provide real protection for existing homes Long Term:

Upon completion of project - Keep housing affordable by making flood insurance available to residents at the lowest possible rates Combined with the FM Diversion- Provide for greater than 100 year protection for the largest population center in ND Frequently Asked Questions Why build flood protection if Diversion Project is constructed? Levee/Floodwall will provide real/interim flood protection

Levee/Floodwall will be compatible with the Diversion Project by providing protection on the greater than 100 year flood events Levee/Floodwall + Diversion = Increased level of flood protection Frequently Asked Questions Will I be assessed for this project? For Edgewood Estates residents, Yes The cost of the street improvements is being paid for by the Fargo Park District and Edgewood Estates per the agreement made between the Park District,

the Developer, and the City of Fargo. The costs associated with the flood protection on the project is budgeted under the sales tax. Proposed Project Design Goals Road Improvements to improve access and emergency response capabilities to Edgewood Estates and Edgewood Golf Course Construct permanent flood mitigation along Golf Course Ave. between Elm St. and the existing

Edgewood Estates levee Minimize the impacts to private property Integrate the flood mitigation system into the golf course Ro se Cr ee

k Pk w y S Proposed Project Option #1

Proposed Project Option #2 Path Forward / Schedule December 2016 Park Board Review January 2017 City Commission Review Early 2017 Project Design Mid/Late 2017 Potentially Begin Construction on Portions or all of the Project $5.0 Million Estimated Construction Cost

Acquisition Overview At this time we do not anticipate having to acquire homes but we may need easements from the Fargo Park District and homeowners depending on the preferred option Questions/Comments? http://www.cityoffargo.com/ - Flood Control Projects www.fargofloodinsurance.com [email protected]

Recently Viewed Presentations

  • Time Conversion Chart  Daylight Savings Time  TOPOFF 4

    Time Conversion Chart Daylight Savings Time TOPOFF 4

    Time Conversion Chart - Daylight Savings Time - TOPOFF 4 UTC/ GMT EDT MST (AZ does not observe Daylight Savings Time) PDT Guam ( Plus 1 indicates the Hours when Guam time is on the next day compared to EDT)
  • On Writing

    On Writing

    Sentences within a paragraph need to connect to each other and work together as a whole. One of the best ways to achieve coherence is to use transition words/sentence connectors. Element 4: COMPLETENESS. Completeness means a paragraph is well-developed. If...
  • NCS presentation - Supporting Inspiration

    NCS presentation - Supporting Inspiration

    UCAS Applications - The Facts. This is a formal application. There are 4000 characters and 47 lines limit. Paragraphs are important. Write it in Word and then cut and paste into Apply (UCAS Application System) Spelling, punctuation and grammar need...
  • Fast Ethernet and Gigabit Ethernet - WPI

    Fast Ethernet and Gigabit Ethernet - WPI

    Times New Roman Wingdings Default Design Fast Ethernet and Gigabit Ethernet Fast Ethernet (100BASE-T) Fast Ethernet [IEEE 802.3u] 100 BASE T Fast Ethernet Details 100 BASE T4 100 BASE T4 100 BASE T4 100 Base TX 100 BASE FX Fast...
  • Case Study 4 New York State Alternate Route

    Case Study 4 New York State Alternate Route

    New York State Alternate Route 7 Problem 4 ... by the first minute in segment 3 and by the third minute in segment 5 The demand that wasn't served during time period 2 has been transferred to time period 3,...
  • 3D Sensing - University of Washington

    3D Sensing - University of Washington

    Solve by computing the closest approach of the two skew rays. V If the rays intersected perfectly in 3D, the intersection would be P. Instead, we solve for the shortest line segment connecting the two rays and let P be...
  • Unit 6: Molecular Compounds

    Unit 6: Molecular Compounds

    SiH. 4 AsF. 5 NO. 3-ClO. 4-Intramolecular vs. Intermolecular. ... polar molecules attract to each other when the positive end of one molecule is near the negative end of another. Depends on polarity. Types of Intermolecular forces. hydrogen bonding:
  • Fatal Facts - Hydraulic Pressure and the Dangers

    Fatal Facts - Hydraulic Pressure and the Dangers

    Fluid Power Safety Institute Hydraulic Pressure Fatal Facts - Hydraulic Pressure and the Dangers Description of the Accident: A machine operator was fatally injured while he was attempting to bleed trapped air from a hydraulic cylinder located on an automated...